Breadcrumb: Home > Applications > Fluorescent Leak Testing
Updated:2026-11-02
Views: Hydraulic maintenance bills follow a pattern: the more you repair on breakdown, the more you spend. A liter of leaked oil is cheap, but a leak point nobody can find, downtime that stretches out, and contamination that wears pumps and valves push the cost up by the hour and by the component. This article applies a preventive maintenance framework to hydraulic systems: three separate schedules set the inspection rhythm, four leak-finding methods are compared, dosage is set by system type, and the scan order runs from the pump station to the actuators.
Hydraulic maintenance bills follow a pattern: the more you repair on breakdown, the more you spend. A liter of leaked oil is not expensive in itself, but when the seepage point cannot be found, downtime stretches out and contaminated fluid wears pumps and valves, the cost doubles by the hour and by the component. A published guide on routine hydraulic maintenance and inspection makes exactly this point - the value of a preventive maintenance (PM) plan is not more repairs, but stopping a problem before it becomes a failure. This article applies that framework to hydraulic systems and folds fluorescent leak detection into the plan: how LUYOR-6100 should be used, how much to add, and when to look.
The cost of unplanned downtime comes in layers. The surface layer is the downtime itself: an excavator idle for a day, a production line down for a shift, a loss that can be calculated directly. The second layer is collateral damage: once abrasive particles and water in the hydraulic oil exceed limits, wear in pumps, valves and cylinders accelerates, so the leak repair is followed by component repair. The third layer is delivery and reputation: key equipment failing just before a delivery date costs the contract.
A preventive maintenance plan addresses all three layers: it lowers follow-on repair costs, reduces unplanned downtime, and supports overall operating results. The original wording is blunt - proactive maintenance keeps hydraulic systems and components in better condition for longer.
The original splits the content of a maintenance plan into three blocks: routine scheduled servicing, routine inspection, and preventive parts replacement. The three have different natures, and mixing them into one table causes omissions - servicing runs on a cycle, inspection reads condition, and replacement is triggered by service life or by a reading.
Applied to a hydraulic system, the layers look like this:
| Level | Typical content | Suggested frequency | Criterion |
|---|---|---|---|
| Routine servicing | Oil top-up, filter change, radiator cleaning, breather check | Per OEM manual / running hours | Do at the interval, regardless of condition |
| Routine inspection | Oil temperature, system pressure and differential, hose appearance, fitting weep, cylinder rod | Pre-shift plus weekly | Compare with baseline, record any exceedance |
| Preventive replacement | High-pressure hoses, seals, accumulator bladders, filter elements | Triggered by life or trend | Strength loss, age cracking, rising differential |
The common practice the original recommends is to keep schedules for different kinds of work separate: one table for routine servicing, one for routine inspection, one for replacement. The benefit is clear responsibility - a missing entry on the inspection sheet is obvious at a glance, and servicing done early or late is traceable. At the same time, check the machine manual and the OEM recommendations so that each round covers everything it should see.
Hydraulic equipment has another peculiarity: most units are a case of one machine, one condition. An excavator and a machine-tool power unit of the same model can differ widely in duty, oil and environment, so a schedule cannot be copied across. Set the frequency for each machine individually, and use running hours rather than calendar days as the main axis.
Two requirements from the original are worth writing into the procedure: all maintenance activity is recorded in one place, and each machine has its own record. At the same time, name one person responsible for coordinating all related activity - in a small company that is usually the owner or a supervisor wearing two hats, in a large one the equipment manager or the maintenance foreman.
One more step the original does not spell out but that shows clearly in the field: records must carry readings. A logbook that records nothing but "inspected" has no trend value three months later; a logbook that carries oil temperature, differential pressure, top-up volume, and the position and photograph of a fluorescence spot lets you see that a hose is getting worse.
Seepage is the classic early-silent, late-expensive problem in a hydraulic system. A pinhole in a weld, a weeping fitting, a hardened seal - the stained area is often just a few millimeters across, and once it is covered by oil sludge and dust it is hard to pick out by eye. Pressure testing and soap solution require a shutdown and often line disassembly, which is expensive on equipment in service.
| Method | Shutdown needed | Line disassembly | Detects micro-seepage | Repeatable | Suitable for |
|---|---|---|---|---|---|
| Visual plus wipe | No | No | Poor; largely defeated once sludge covers the area | Yes | Obvious drips, daily rounds |
| Pressure test plus soap | Yes | Often | Fair | Must be redone each time | Single parts, offline repair |
| Ultrasonic leak detection | Partly | No | Fair, but affected by ambient noise | Yes | Gas leaks, local points |
| Fluorescent tracer (LUYOR-6100) | No, normal operation is enough | No | Good; even a very small seep leaves a fluorescent spot | Yes, the dye persists | Equipment in service, fleets, line-wide surveys |
The fluorescent method has one precondition: the medium being checked must be oil. It relies on dye circulating with the oil and seeping out at the leak, so it is limited to petroleum-based or synthetic oil systems. If the system holds water or glycol, use the water-based model LUYOR-6200 instead.
LUYOR-6100 is an oil-soluble concentrate (Solvent Red 175 in a hydrogenated naphthenic solvent system). It is fully miscible with petroleum products and insoluble in water, with an excitation peak near 494 nm and an emission peak near 535 nm, and it shows bright yellow-white fluorescence under a 365 nm UV lamp. That last point matters: most oils carry a weak blue natural fluorescence of their own, and yellow-white against a blue background is hard to confuse with the background.
Take the starting dosage for the system type, then fine-tune it against the contrast you actually see:
| System type | Recommended dosage | Notes |
|---|---|---|
| Hydraulic transmission fluid | 500-2000 ppm | Suits mineral oils, synthetic oils and many biodegradable oils |
| Automotive engine oil | 500 ppm | Suits both synthetic and mineral oils |
| Diesel engine oil | 700-2000 ppm | Use the upper end for heavy-duty duty |
| Fuel | 700 ppm | Diesel and other fuel oils |
ppm is by volume, and 500 ppm is about 0.5 ml per liter of oil. Converted to real equipment: a 200 L power unit at 1000 ppm needs about 100 ml, which is exactly one 100 ml bottle. A 30 ml bottle suits a single small machine or a trial check; the 4 L and 18 L pails are for fleets and central filling.
No stirring is needed after addition. With the system running normally, the dye dissolves fully and reaches every point in about 5-10 minutes; with the system static it takes 2-3 hours, and longer in cold conditions. That window fits into pre-shift warm-up or a shift handover, so no extra downtime is used.
The efficiency of fluorescent leak detection depends on whether the scan order is fixed. Follow the flow of the medium and take the same route every time, and fewer points are missed while repeat checks stay comparable:
Operating notes: the darker the ambient light, the stronger the contrast, so switch lights off where you can; hold the lamp at 30-45° to the surface to avoid glare from polished metal; wear UV protective glasses, and do not point the lamp at your eyes or leave it on skin. When you find a spot, photograph it and mark the position (a label or a marker circle) before scheduling the repair - do not wipe as you go, because wiping removes the baseline for the recheck.
This is where fluorescent leak detection earns its place in planned maintenance: the dye stays in the system, so after the repair you do not dose again - you simply look again. If no yellow-white fluorescence appears at the original position, the leak has been eliminated; if it still glows, the repair was incomplete or there is a second leak point. That is more direct than a pressure hold test, and much faster than watching for fresh oil stains over several days.
The convenience that comes with it is that the system does not need flushing: at normal ratios the dye has no effect on lubricating or hydraulic oil performance, it stays in place for repeated checks, and no drain or flush is needed at the end of the survey. When you top up the oil, top up the dye in proportion.
One boundary should be drawn clearly: fluorescent leak detection shows where a leak is, and it does not replace oil analysis. Particle count, water content and acid number are a separate line, and the two are complementary - leak detection covers seal integrity, analysis covers oil health, and either one alone gives an incomplete picture.
Turn the points above into a table and merge it straight into the machine inspection file:
| Item | Frequency | Tool | Criterion | Record |
|---|---|---|---|---|
| Oil level, oil temperature, system differential | Pre-shift | Gauge / spot thermometer | Compare with baseline, record exceedance | Reading into logbook |
| Fluorescent sweep (whole machine) | Quarterly, or right after repair | LUYOR-365L + 6100 | No yellow-white fluorescent spots | Photo plus position mark |
| Fluorescent recheck of key points | Monthly | LUYOR-3180 | Original leak position no longer glows | Recheck date and conclusion |
| Dye concentration check | After oil top-up | Calculated from ppm | Within the 500-2000 ppm range | Dosage record |
| Oil analysis (particle count / water) | Per OEM interval | Third party or on-site | Per machine class limits | Report on file |
Choose packaging by scale: 30 ml for a single machine or a service vehicle, 100 ml as a stock item at a repair station, 240 ml or 500 ml for batch dosing on gensets and production lines, and 4 L / 18 L pails for fleets and central filling. Full model details and the dosage table are on the LUYOR-6100 product page; for water systems or mixed media, compare how the three models divide the work in the fluorescent leak detection range, or read these two field cases: how to find leaks on paper mill equipment and how to trace a water system leak. If you want fluorescent leak detection written into your existing PM file, send us the equipment type, oil, reservoir volume and inspection frequency, and we can work out the dosage and the schedule together.
This article belongs to the fluorescent leak detection technology section.
Other sections on the same product line are fluorescent leak detection (add a tracer, find the leak point with a UV lamp, locate before disassembly), 365 nm blacklight (UV area lighting for penetrant testing, leak detection and fluorescence inspection, where irradiance matters more than wattage), and industrial test instruments (the entry point for UV inspection, speed measurement, stroboscopic observation and surface inspection).
Models mentioned in this article: LUYOR-6100, LUYOR-365L, LUYOR-3180. Ranges, accuracy and accessory lists for each model are given on the product pages.
Email: info@xinysun.com
Tel: 131-2093-6518
Address: 1525 Minqiang Road, Bldg 26, Songjiang, Shanghai
Copyright 2026 Xinysun Instrument (Shanghai) Co., Ltd. All rights reserved.
ICP:ICP-2026046447